Sugar plant Opava, blocks 1 and 2

Country: Czech Republic

Customer: AGRANA, Moravskoslezské cukrovary a.s.

Scope of delivery: Reconstruction of TG1 and TG2 units supplied by PBS (1.6 MW), hydraulic turbine control system. Replacement of the original control system. A combination of a BR and DCS actuator control block from Siemens is used. Speed ​​measurement with two independent speed sensors.

Design, assembly, disassembly, supervision, testing and putting into operation

Realization: 2018