Sugar plant Zeyawaddy, blocks 1 and 2, 2 MW
Country: Myanmar
Customer: Hwa Yuan Enterprise PTE LTD
Scope of delivery: Reconstruction of two back-pressure turbines at Units 1 and 2 supplied by PBS (2 + 2 MW). Turbine hydraulic control system. Replacement of the original control system. Use of control block with EH converter and dump valve with solenoid valve. Equipped with 2oo3 Trip block. Speed measurement with two independent speed sensors. TICON control system. Operating mode: Active power, back pressure control, MOV, island operation with power distribution.
Design, assembly, disassembly, supervision, testing and putting into operation
Realization: 2019