Boiler (K12) retrofit – Heating plant České Budějovice, a.s.

Country: Czech republic

Customer: Teplárna České Budějovice, a.s.

Scope of deliveries:

The subject of the delivery consist of:

PART 1: Retrofit of the existing K12 boiler to a boiler with a smaller steam output (55 t/h) burning wood chips.

PART 2: Construction of a warehouse for the receiving, processing, storage and transport of wood chips. Connection of the new fuel transport routes to the existing fuel transport routes for the K12 boiler.

Term of realization: 2022 – 2024, the equipment has been delivered and is currently being installed and then put into operation