Power plant Hodonín, ČEZ, 4th block, 55 MW

Country: Czech Republic

Customer: ČEZ

Scope of delivery: Reconstruction of turbo set of 4th block delivered by company Škoda, 55 MW. Replacement of original hydraulic-mechanical control system. Use of newly installed directly powered electro-hydraulic regulation. Installation of EH pressure regulation of secondary and tertiary oil. Installation of main action part of electronic position measurement. Installation of new turbine speed electronic measurement.

Design, assembly, disassembly, supervision, testing and putting into operation

Realization: 2021