Power plant Komořany, United Energy, block TG9, 32 MW

Country: Czech Republic

Customer: United Energy

Scope of delivery: Replacement of original hydraulic-mechanical back pressure regulation. Use of a new installed EH convertor powered through new installed duplex oil filter. Pressure of secondary oil regulated by EH convertor. Installed new pressure measurement. Installation of new turbine speed sensors.

Design, assembly, disassembly, supervision, testing and putting into operation

Realization: 2021