Newhurst, UK

In January 2022, INVELT ENERGO has supplied together with INVELT-ENERGO an E-House equipped with a control and excitation systems, electrical protections panel, MCC and Main Terminal Box for 48 MW generator. Transport to site was part of the scope of supply.