Gasification of Tabor Heating Plant – TTA
Installation of one cogeneration unit (with one gas engine, power output 11,5 MWe) and one container cogeneration unit (power output 0,528 MWe).
Installation of one cogeneration unit (with one gas engine, power output 11,5 MWe) and one container cogeneration unit (power output 0,528 MWe).
Boiler (K12) retrofit – delivery of a new boiler with a steam output of 55 t/h
Newly signed project for supply, manufacture, testing and documentation for the supply of electrical equipment and control system.
Supply, manufacture, testing and documentation for the supply of electrical equipment and control system.
Realization: 2019 – 2022
In January 2022, INVELT ENERGO has supplied together with INVELT-ENERGO an E-House equipped with a control and excitation systems, electrical protections panel, MCC and Main Terminal Box for 48 MW generator. Transport to site was part of the scope of supply.
From August 2020 to December 2021, INVELT SERVIS has supplied together with INVELT ELEKTRO and INVELT ENERGO new “turn-key” technology for biomass transport to K6 boiler.