Gasification of Tabor Heating Plant – TTA
Installation of one cogeneration unit (with one gas engine, power output 11,5 MWe) and one container cogeneration unit (power output 0,528 MWe).
Installation of one cogeneration unit (with one gas engine, power output 11,5 MWe) and one container cogeneration unit (power output 0,528 MWe).
Boiler (K12) retrofit – delivery of a new boiler with a steam output of 55 t/h
Term of realization: 2020 – 2021
Term of realization: 2020 – 2021