Gasification of Tabor Heating Plant – TTA
Installation of one cogeneration unit (with one gas engine, power output 11,5 MWe) and one container cogeneration unit (power output 0,528 MWe).
Installation of one cogeneration unit (with one gas engine, power output 11,5 MWe) and one container cogeneration unit (power output 0,528 MWe).
Boiler (K12) retrofit – delivery of a new boiler with a steam output of 55 t/h
Newly signed project for supply, manufacture, testing and documentation for the supply of electrical equipment and control system.
Modernization of power outlets in PR 6kV substation, heating plant Brno
Supply, manufacture, testing and documentation for the supply of electrical equipment and control system.
Realization: 2019 – 2022
Term of realization: 2019 – 2022
Term of realization: 2020 – 2021
Term of realization: 2019 – 2021
Term of realization: 2019