Atacama I. and II.
Term of realization: 2014 – 2021
Term of realization: 2014 – 2021
Realization: 2014 – 2021
In January 2022, INVELT ENERGO has supplied together with INVELT-ENERGO an E-House equipped with a control and excitation systems, electrical protections panel, MCC and Main Terminal Box for 48 MW generator. Transport to site was part of the scope of supply.
From August 2020 to December 2021, INVELT SERVIS has supplied together with INVELT ELEKTRO and INVELT ENERGO new “turn-key” technology for biomass transport to K6 boiler.
Term of realization: 2019 – 2020
Realization: 2014 – 2021
Realization: 2020
Realization: 2019 – 2020
Realization: 2019 – 2020
Realization: 2019 – 2020